Design/Build RTU Replacement Time-lapse – Season 4


Over the weekend of May 20th, a contractor installed a new 493 ton Seasons-4 roof top unit in place of an existing old Tempmaster unit. The new RTU was designed for exact alignment with the existing unit’s footprint.

The Seasons-4 unit alignment accounted for all of the old unit’s gas, chilled water, electric power, and control feeds, thereby eliminating the need for additional field piping or wiring.

The unit arrived onsite Friday night, May 19th, and was completely installed and commissioned by Sunday the 21st. The 2-day timeline allowed for no impact to building tenants in the 200,000 sq ft. building. The unit has 493 tons in chilled water cooling capacity, 4,000 MBH in gas heating capacity, and is capable of supplying 113,000 CFM of conditioned air. The total RTU weight is 65,000 lbs.

The Seasons-4 unit was supplied by Noble Associates, Inc. See the entire process above through our captured time-lapse.

Building and business owners in the Greater Boston area, as well as all throughout the New England region, can count on the top quality engineering and services available from Noble Associates, Inc.

Our team of engineers and technicians can help you complete your HVAC projects for new construction, as well as for existing structures, either through retrofitting or other modernization projects.

Give us a call at 781-337-1630 to get an estimate for your project or to learn more about the comprehensive HVAC equipment line we provide.

Image gallery: